VVER: Perbedaan antara revisi
Konten dihapus Konten ditambahkan
k +perbaiki; perubahan kosmetik |
Wagino Bot (bicara | kontrib) k →Instalasi energi: minor cosmetic change |
||
Baris 49:
| [[Mochovce Nuclear Power Plants|Mochovce]] || Slovakia || 2 × VVER-440/213 <br /> (2 × VVER-440/213) || Units 3 and 4 under construction, planned to be operational between 2015 and 2017.
|-
| [[Novovoronezh Nuclear Power Plant|Novovoronezh]] || Russia || 1 x VVER-210 (V-1)<br />1 x VVER-365 (V-3M)<br />2 × VVER-440/179 <br /> 1 × VVER-1000/187 || All units are prototypes. Unit 1 and 2 shutdown. Unit 3 modernised in 2002.<ref>{{cite news
|-
| [[Novovoronezh Nuclear Power Plant II|Novovoronezh II]] || Russia || (2 × VVER-1200/392M) (AES-2006) || The units are the prototypes of the VVER-1200/392M (AES-2006) and under construction.
|