PLTA Tonsea Lama memiliki 3 unit generator, dimana PLTA ini mampu menyalurkan listrik ke sistem interkoneksi Sulawesi Utara Gorontalo dan membantu ketersedian pasokan listrik di kedua Provinsi tersebut.
 
TonsealamaPLTA HydroelectricTonsea PowerLama Plantor orTonsea TonsealamaLama Hydroelectric Power Plant, is onea of the water-poweredhydroelectric power plantsplant, located in TonsealamaTonsea Lama Village, North Tondano District, Minahasa Regency, North Sulawesi Province. TheThis PLTAhydropower plant uses water from the Tondano River water as a driving source forof itsturbine turbinespropulsion, thisthe Inin-take dam andof PLTAthis hydropower inletplant is located in the TonsealamaTonsea Lama area of North​​North Tondano.
 
Tonsea Lama Hydroelectric Power Plant (PLTA) Tonsea Lama is the oldest hydropower plant in Indonesia. Built during the Dutch colonial era in 1912. PLTA Tonsea Lama is a historical building left by the Dutch and also the Japanese, where it was recorded that it was first established by the Dutch Colonial Government and was once controlled by the Japanese Occupation Army, then returned to the Dutch Colonial Government, then after Indonesia's independence , managed to become PLTA PT. PLN.
The Tonsealama Hydroelectric Power Plant Tonsealama is the oldest PLTA in Indonesia.
Built in the Dutch colonial era in 1912.
 
The historicization of the land where this building stands, which is on land looted by the Dutch colonial government from indigenous people in Tonsea Lama Village, where the original owner of the land is recorded in the Land Register Number 829 Folio 80 of the Tonsea Lama Village Government, is land owned by pasini (custom/Minahasa ) the late Nelwan Hendrik (1863-1949) and his wife Pakasi Ketsia who at that time were natives; could not do anything to take over his land from the hands of the invaders (Quoted from the records of the Nelwan Pakasi Kandow Family in Old Tonsea by Felix Mantiri and Sefry Nelwan).
Old Tonsea Hydroelectric Power Plant which was built and operated since the Dutch colonial era has a beautiful environment. Aside from being one of the sources of electricity production for the needs of the PLN customers, in this PLTA also for each of those who visit as if invited to explore the historical heritage tracks of the Dutch and Japanese. Starting from water dams, tunnels, turbines, to generators that are decades old.
 
OldThis Tonseahydropower Hydroelectricfacility Powerhas Plant which was built andbeen operated since the Dutch colonial era. It has a beautiful environment. AsideApart from being one of thea sourcessource of electricity production for the needs of the PLN customerscustomer community, inat this PLTAhydropower alsoplant, foreveryone eachwho ofvisits thoseseems whoto visit as ifbe invited to exploretrace the historical heritage tracks of the Dutch and also the Japanese. Starting from water dams, tunnels, turbines, to generators that are decades old.
Despite its long standing and passing through various periods of government, this 40 MW hydroelectric power plant is still operating and illuminating thousands of homes in North Sulawesi. This PLTA is operated by the PLN Minahasa Generation Sector, PLN Suluttenggo Region.
 
The Tonsea Lama PLTA has 3 generator units, where the PLTA is able to deliver electricity to the North Sulawesi Gorontalo interconnection system and help supply electricity in the two Provinces.
Even though it has been established for a long time and has gone through various periods of government, this 40 MW hydropower plant is still operating and lighting up thousands of homes in North Sulawesi. This hydropower plant is operated by PLN Minahasa Generation Sector, PLN Suluttenggo Region. The Tonsea Lama PLTA has 3 generator units, where the PLTA is capable of distributing electricity to the interconnection system of North Sulawesi Gorontalo and helping the availability of electricity supply in the two provinces.
 
[[Kategori:Pembangkit listrik tenaga air]]